About Us Application Products R&D Collaborator Clients Case Study Enquiry Gallary Contact
Rieco Industries Ltd
     
 

Electrostatic Precipitator

 

Please provide all available information on this form to enable us to select the most efficient system for your process.
Responders Name : *
Company :
Telephone Number : *
Mobile No :
Fax :
E Mail Id : *
     
1. No. of ESPs : No
2. Boiler type :
3. Fuel fired :
4. Gas Volume : Am3/sec
5. Gas Temperature : Degree C
6. Dew Point at atm. pressure : Degree C
7. Acid dew point at atm. pressure : Degree C
8. No. of streams :
9. Pressure Difference : mm WC
10. Operating Pressure : mm WC
11. Casing Design Pressure : mm WC
12. Casing Design Temperature : Degree C
13. ESP Dust Loading : gm / Nm3
14. Site location
(Barometric pressure / Altitude of site)
:
15. Project Name :
16. Outlet Emission desired : mg / Nm3
17. Flue Gas Composition (% of Volume)    
 
CO2   %  
H2O   %  
SO2   %  
O2   %  
N2   %  
  %  
   
18. Fuel Composition (% by weight)    
C   %  
H2   %  
N2   %  
S   %  
H2O   %  
ASH   %  
O2   %  
  %  
GCVof Fuel   K cal/kg  
   
19. Particle size distribution (% by weight)    
 
Above 300 microns   %  
150 To 300 microns   %  
75 To 150 microns   %  
Below 75 microns   %  
45 to 75 microns   %  
38 to 45 microns   %  
20 to 38 microns   %  
10 to 20 microns   %  
5 to 10 microns   %  
Below 5 microns   %  
   
20. Ash analysis (% By weight)    
 
SiO2   %  
AL2O3   %  
Fe2O3   %  
CaO   %  
MgO   %  
TiO2   %  
P2O5   %  
Na2O   %  
K2O   %  
SO3   %  
  %  
   
21. Desired Material of construction /Thickness
 
Casing   mm  
Inlet / Outlet Cones   mm  
Hopper   mm  
   
22. Hopper Valley angle :
Deg . 55 Deg . 60 Deg . 65
23. Clear height required from
Ground level to Hopper
outlet
:

m

24. Any other specific requirement /
recommendation – pl specify :
:
Drawing (if any) : sales_pune@rieco.com
* Minimum Data Required